All Pro Contractors Ltd · Milton Keynes and 30 miles around itallprocontractorsltd@gmail.com
New kerb edging laid along a lawn by a tarmac drive
4.94 out of 560 TrustATrader reviews

Block paving driveways in Milton Keynes

Block paving driveways in Milton Keynes go wrong underneath, not on top: too little sub-base, no edge restraint and nowhere for the water to go.

Free quote, fixed price and no sales visit.

  • 16 years on the tools
  • 4.94 from 60 reviews
  • Fully insured
  • Free written quotes

Get a free written quote

Denis looks at the job, photographs what he finds and sends you a written price. No hard sell and no sales visit.

4.94 / 560 reviews
VerifiedExpert Roofer member
Insurance2 millionAllianz, in date
Step 1 of 2
Your job

Free quote, fixed price and no sales visit.

Your contact details
Add email or notes (optional)

Free quote, fixed price and no sales visit.

Your details are used to answer your enquiry, nothing else. Privacy policy. Prefer to call? 01908 024436.

TrustATrader 4.94 out of 560 TrustATrader reviews Expert Roofer Verified Expert Roofer VerifiedIndependently checked
16 years on the tools
Fully insured to 2 million pounds
Free written quotes

Dig out and sub-base

The old surface and soft ground come out to the depth the drive actually needs for vehicles, then MOT type one goes in, compacted in layers. That is the part that decides whether you get ruts in two winters.

Kerb edging along a grass verge beside a drive

Edges and falls

Edge courses haunched in concrete so the blocks cannot creep sideways, and falls set to a drainage channel or a soakaway so water leaves the drive instead of running at the front door.

New concrete kerbs edging a lawn beside a tarmac drive

Blocks and finishes

Standard block, cobble setts and larger format flags, with a contrasting border or a soldier course to frame it. Kiln-dried sand brushed in and the surface vibrated so it locks up solid.

What is included

  • Dug out to the right depth
  • Compacted MOT type one sub-base
  • Edges haunched in concrete
  • Falls and drainage designed in
  • Block, cobble and flag options
  • Old surface taken away

How a block paving driveway is built

  1. Survey and levels. Levels taken from the house, the road and the drainage, so the finished drive falls the right way.
  2. Dig out. The old surface and soft ground removed to the depth a drive for cars needs.
  3. Sub-base. MOT type 1 laid and compacted in layers with a plate compactor.
  4. Edges. Edging kerbs or a soldier course set in concrete to stop the blocks spreading.
  5. Lay the blocks. Blocks laid on a screeded sand bed in the pattern you choose, with cuts made neatly at the edges.
  6. Sand and compact. Kiln-dried sand brushed in and the surface vibrated so it locks together.

Signs your driveway needs replacing

  • Ruts where the car parks
  • Blocks sinking or lifting
  • Weeds growing through the joints
  • Water pooling by the front door
  • Cracked or crumbling tarmac or concrete
  • Edges breaking away

Driveway options

  • Standard block: Hard-wearing and easy to repair one block at a time.
  • Cobble sett: A tumbled, older look.
  • Permeable block: Lets rainwater drain through so it soaks away on your own land.
  • Borders and kerbs: A contrasting border or kerb edge to frame the drive.
  • Drainage channel: A linear drain across the drive by the garage or front door, connected to a soakaway, where the levels mean water would otherwise run towards the house.

How long it takes

A typical two-car driveway is about a week from dig out to the last sweep, depending on weather and how much comes out.

What affects the price

  • Area of the drive
  • Depth of dig out and waste
  • Block chosen
  • Drainage required
  • Kerbs, steps and borders

One fixed written price after the free visit.

Aftercare

Brush the joints and top up the sand where needed, and treat weeds early. Oil marks lift best when cleaned quickly.

Photographs from our own jobs

Real work, photographed on site by our team. Tap a photograph to see the job it came from.

Recent work

Real jobs, photographed on site. No stock photography anywhere on this website.

See the photo gallery

What our customers say

Verbatim from our TrustATrader profile, which has 60 reviews at 4.94 out of 5.

5.0/5
Denis was friendly and professional, clearly explaining the work. The new insulated roof, fascias, and guttering look incredible. The team were efficient and respectful throughout. Highly recommend All Pro Roofing & Guttering.
LeoTrustATrader · October 2025
5.0/5
Always on time polite and very informative keeping me up to date with videos of the work taking place. I would definitely use them again.
AlistairTrustATrader · May 2025
5.0/5
Had a gutter fall off overnight with all the heavy wind! Popped over and fixed with no fuss, happy customer.
Thomas HealTrustATrader · April 2025

Read all 60 reviews See them on TrustATrader

How it works

  1. Tell Denis about the jobYour postcode and what needs doing, by phone or through the form.
  2. He looks at it properlyOn the roof or in the garden, not a guess from the pavement.
  3. You see the photographsPictures of what is actually wrong, sent to you.
  4. Fixed written priceOne figure, in writing, that does not move once we start.

Common questions

Do I need planning permission for a driveway?

Not usually if the surface is permeable or the water drains to a border or soakaway on your own land. Draining straight onto the road is what causes problems.

How long does a driveway take?

A typical two-car drive is around a week from dig out to sanding in, weather depending.

Can you do resin instead?

We will quote block paving as standard. If you have your heart set on resin we will tell you honestly whether your base suits it.

How deep should a driveway base be?

Deep enough for vehicles on your ground. We dig out and lay compacted MOT type 1 to suit, which is what stops ruts forming.

Can a block drive be repaired?

Yes. A sunk area is lifted, the base made good and the same blocks relaid.

Do I need planning permission for a new drive?

Usually not if the surface is permeable or the water drains to a border or soakaway on your own land. Draining straight onto the road is what needs permission.

Recent jobs like this

Finished work in our gallery, photographed by our team from start to finish.

Related services

Get a free written quote

Denis looks at the job, photographs it and sends you a fixed price. Fully insured, 60 reviews at 4.94 out of 5.

Free quote, fixed price and no sales visit.