All Pro Contractors Ltd · Milton Keynes and 30 miles around itallprocontractorsltd@gmail.com
Hipped roof stripped to the rafters above a conservatory
4.94 out of 560 TrustATrader reviews

New roof in Milton Keynes

A new roof in Milton Keynes is the biggest single job most houses ever need, so it is worth having it done once and done properly.

Free roof inspection, no call-out charge.

Free quote, fixed price and no sales visit.

  • 16 years on the tools
  • 4.94 from 60 reviews
  • Fully insured
  • Free written quotes

Get a free written quote

Denis looks at the job, photographs what he finds and sends you a written price. No hard sell and no sales visit.

4.94 / 560 reviews
VerifiedExpert Roofer member
Insurance2 millionAllianz, in date
Step 1 of 2
Your job

Free quote, fixed price and no sales visit.

Your contact details
Add email or notes (optional)

Free quote, fixed price and no sales visit.

Your details are used to answer your enquiry, nothing else. Privacy policy. Prefer to call? 01908 024436.

TrustATrader 4.94 out of 560 TrustATrader reviews Expert Roofer Verified Expert Roofer VerifiedIndependently checked
16 years on the tools
Fully insured to 2 million pounds
Free written quotes

What a full re-roof includes

Scaffold up and the old tiles and felt off. Timbers checked and replaced where they have gone. New breathable membrane and treated battens, then the covering laid, verges and valleys formed, and the ridge fixed dry rather than bedded in sand and cement that cracks in five years.

Battens fixed over membrane next to a dormer window

How long it takes

A standard semi is usually three to five working days once the scaffold is up, weather permitting. We sheet the roof each night so the house stays dry, and everything goes in a skip and off the drive, not in a pile by your fence.

Roof stripped to the rafters with old felt and insulation showing

What it costs

The price turns on the size and pitch of the roof, the state of the timbers, the tile you choose and the scaffold. We measure, tell you what we find in the loft, and give you one fixed written figure. If the timbers are sound and the tiles are good, we will tell you that too. You can see a re-roof of a semi-detached house photographed from strip to finish in our work gallery.

Breathable membrane laid along a roof beside the scaffold

What is included

  • Stripped back to the rafters, nothing left to chance
  • New treated battens and breathable membrane
  • Dry ridge and dry verge, no cracked mortar
  • Tile or natural slate, your choice
  • Scaffold, skip and clean-up in the price
  • Guaranteed work, terms in writing with your quote

How a new roof goes on, step by step

  1. Scaffold and protection. Scaffold front and back with a loading bay, and sheeting over conservatories and paths so nothing lands on them.
  2. Strip to the rafters. Old tiles, battens and felt come off and go straight down to a skip, never into your borders.
  3. Timber check. Rafters, wall plates and the fascia line are checked. Anything rotten is cut out and replaced before it is covered again.
  4. Membrane and battens. Breathable membrane laid from the eaves up, then new treated battens set to the gauge of the new tile and fixed into every rafter.
  5. Tiles, valleys and verges. The covering goes on course by course, clipped to the current fixing standard, with valleys formed and verges finished dry.
  6. Dry ridge and handover. Ridge and hips fixed mechanically on a ventilated roll, scaffold down, drive swept and finished photographs sent.

Signs a new roof is the right answer

  • Tiles slipping in more than one place, winter after winter
  • Felt that crumbles to the touch in the loft
  • Battens that are soft or have nails rusted through
  • Concrete tiles with the surface worn away and moss rooted in
  • Repairs that keep coming back on different slopes
  • A roof that is the original covering on a house over 60 years old

Choosing the covering for your new roof

  • Concrete interlocking tile: Best value per square metre and quick to lay. The grey interlocking tile on our Woburn Sands re-roof is a typical choice.
  • Plain clay tile: Traditional look for period houses and conservation areas, with a longer life and a higher price.
  • Natural slate: The longest-lasting covering we lay, and the right one where the street is slate.
  • Re-laying your own tiles: Where the existing tiles are sound, we strip, re-batten, re-felt and put them back, which keeps the look and cuts the material cost.

How long it takes

A three-bedroom semi is around a working week from scaffold up to scaffold down. A bungalow is often quicker, and a detached house with hips, valleys and dormers takes longer. Rain slows the job but never leaves the house open: anything stripped is covered the same day.

What affects the price

  • Roof area and pitch
  • Hips, valleys, dormers and chimneys
  • Tile or slate chosen
  • Timber replacement found once stripped
  • Scaffold height and access

Typical ranges are on our roof replacement cost page. Your own price is one fixed written figure after the free inspection.

Aftercare

A new roof needs very little. Keep the gutters clear, look at it after a big storm and keep loft insulation back from the eaves so the roof can breathe. Your guarantee terms come in writing with the quote.

Photographs from our own jobs

Real work, photographed on site by our team. Tap a photograph to see the job it came from.

Recent work

Real jobs, photographed on site. No stock photography anywhere on this website.

See the photo gallery

What our customers say

Verbatim from our TrustATrader profile, which has 60 reviews at 4.94 out of 5.

5.0/5
Denis was friendly and professional, clearly explaining the work. The new insulated roof, fascias, and guttering look incredible. The team were efficient and respectful throughout. Highly recommend All Pro Roofing & Guttering.
LeoTrustATrader · October 2025
5.0/5
I have used Dennis from All Pro Roofing a& Guttering for my new roof and would highly recommend him as his team. They did a fantastic job, turned up on time, left no mess & the price was competitive. Great job, thanks Dennis & Team
LizaTrustATrader · January 2024
5.0/5
Great job replacing all roof ridge tiles, guttering repairs front and back and a few other jobs. Tidied up all mess and very good workers. Would recommend.
Edward SmeeTrustATrader · February 2020

Read all 60 reviews See them on TrustATrader

How it works

  1. Tell Denis about the jobYour postcode and what needs doing, by phone or through the form.
  2. He looks at it properlyOn the roof or in the garden, not a guess from the pavement.
  3. You see the photographsPictures of what is actually wrong, sent to you.
  4. Fixed written priceOne figure, in writing, that does not move once we start.

Common questions

How long does a new roof last?

A concrete tile roof laid properly on new battens and membrane should give you decades of service, and slate longer again. What shortens a roof is the detail: mortar ridges, bad flashings and cheap felt. Those are the parts we do not skimp on.

Will you use my existing tiles?

Sometimes. If the tiles are sound and you like them, we can strip, re-batten, re-felt and re-lay them, which saves money. We will tell you on the quote whether yours are worth keeping.

Do I need to be at home?

Not for the whole job. We need access to the drive for the scaffold and the skip, and about ten minutes at the start and the end. You get photographs as the work goes on either way.

Do I need planning permission for a new roof?

Not for a like-for-like re-roof on most houses. Listed buildings and some conservation areas are different, and we tell you before we quote if yours is one of them.

Do you need to get into the loft?

Yes, at the inspection and once during the strip, so we can check the timbers from inside and make sure the loft is clean when we leave.

Recent jobs like this

Finished work in our gallery, photographed by our team from start to finish.

Related services

Get a free written quote

Denis looks at the job, photographs it and sends you a fixed price. Fully insured, 60 reviews at 4.94 out of 5.

Free quote, fixed price and no sales visit.